top of page

TRAINING Single Minute Exchange of Dies
SMED training content
Definition of S.M.E.D.
Reduction objectives:
-
Weight of reference changes in the T.R.S.
-
Link between Reference Changeover Time and batch sizes
-
Cost, duration and frequency of changes
-
Material losses
-
The responsibility of the adjusters
The methodology and its steps
The profitability of S.M.E.D.
The definition of the operating mode adopted
Implementation of solutions
Monitoring of implementation and results obtained
SMED method
GOALS :
-
Effectively manage an S.M.E.D. project.
-
Know the impact of S.M.E.D. on production performance.
AUDIENCE :
-
Managers & Methods and Continuous Improvement technicians
-
Production manager
-
Workshop method technicians
-
Adjusters & operators
-
Maintenance
TRAINING TIME REQUIRED:
-
2 Days of training
-
1 additional day possible for monitoring actions
bottom of page